Working Flow& Layout
10. Supplying components of complete machine
NO. |
Description |
Quantity (set) |
Remark |
1 |
5Tmanual decoiler |
1 |
|
2 |
Guiding device |
1 |
One complete unit as main machine |
3 |
Forming system |
1 |
4 |
Transmission system |
1 |
5 |
Hydraulic guillotine&punching |
1 |
6 |
Support table |
2 |
|
7 |
Hydraulic station |
1 |
|
8 |
Control box |
1 |
|
9 |
Spare parts and tools |
1 |
As attaching list |
- General parameters
No |
Item |
Parameter |
Note |
1 |
Forming Speed |
Max15 m/min(depend on quantity of punching) |
Depend on quantity of punching |
2 |
Forming station |
Around 18 groups |
|
3 |
Total Power |
About 22KW |
|
\4 |
Total Weight |
About9700KGS |
|
5 |
Voltage |
380v,50hz,3p |
|
6 |
Diameter of shaft |
80mm max shaft |
|
5 |
Installation Size |
15 * 1.0 M*1.5 |
|
12. Main parts material
No |
Item |
Parameter |
Note |
1 |
Forming Shaft |
40cr steel with grinding process |
|
2 |
Forming Roller |
Gcr15 with hard chrome coating and heat treatment |
3 |
Cutting Blade |
Cr12MoV with hard treatment |
4 |
Control System |
TOUCHWIN screen,PLC Panasonic |
5 |
Encoder |
OMRON |
6 |
Solenoid valve |
HUADE beijing |
7 |
Low voltage |
SIEMENS |
8 |
Hydraulic parts |
China quality brand |
After Sales Service :
1. Warranty :two year,and we will provide technical support for whole life of the equipment.
2. Delivery time: Within 25 days after deposit receipt your payment
3. Guarantee period: 24months free service/ pay service all the machine life
4. Installation and training
If buyers visit our factory and check the machine, we will teach you how to install and use the machine and also train your
workers/technician face to face.